PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Pigeon Roost Creek Road and Messenger Road are closed at the intersection of SR-136 with detour signs to utilize Bunker Hill Road. In addition, the turning lane serving Prescott South Middle School has been taken out of service and northbound Jefferson Avenue will be restricted to one lane. Motorists are encouraged to use caution while traveling through the work zone and be aware of construction personnel.
[Rogers Group, Inc./Cookeville/CNV284]
PUTNAM COUNTY SR-135 (BURGESS FALLS RD.) TDOT Bridge Inspection southbound at LM 0.00: A routine inspection of the bridge over the Falling Water River will be conducted on Monday, June 3 from 12 PM until 3 PM. During this inspection, the southbound lane will be closed with flaggers directing traffic through the work zone. Motorists are advised to slow down, watch for flaggers, and be prepared to stop.
PUTNAM COUNTY SR-135 (BURGESS FALLS RD.) Utility Work both directions from LM 3.56 to LM 5.57: Shoulder and lane closures on SR-135 from Cookeville Boat Dock Road to Cane Creek Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 04/03/24 through 06/12/24 from 9 am - 2 pm. [2021-771]
PUTNAM COUNTY SR-24 (MONTEREY HWY.) TDOT Bridge Inspection westbound at LM 24.42: A routine inspection of the bridge over the Falling Water River will be conducted on Monday, June 3 from 8 AM until 11 AM. During this inspection, the westbound lane will be closed with flaggers directing traffic through the work zone. Motorists are advised to slow down, watch for flaggers, and be prepared to stop.
VAN BUREN COUNTY SR-285 (MOONEYHAM-LONEWOOD RD.) Utility Work northbound from LM 9.11 to LM 16.18: Flagging operations on SR-285 (Mooneyham-Lonewood Road) between Haston Road and Salzer Mountain Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 06/03/24 through 01/02/25 from 9 am - 2 pm. [2024-309]
WARREN AND WHITE COUNTY SR-136 repair of the bridge over the Caney Fork River LM 2: The bridge will be one lane through the duration of the project. Motorist should use caution and watch for flaggers. Motorist should expect some delays at the bridge with the traffic signal and traffic utilizing one lane.
[Jamison Construction, LLC/McMinnville/CNX109]
Comments
No comments on this item Please log in to comment by clicking here