TDOT roadway activity report

Posted By | August 28, 2015 6:03 am

Last Updated: August 28, 2015 at 6:04 am

August 27, 2015 – September 2, 2015

WHITE COUNTY, SR-111 (Spencer Hwy.) repair of bridge over Calfkiller River (LM 6.37) in Sparta: Work on this project continues. The contractor will be pressure washing and texture coating the bridge during this report period. Flaggers will assist with traffic control as necessary. Estimated project completion date is August 2015. [Mid-State Construction Co, Inc./Sorrelle/CNN292]

WHITE COUNTY, SR-111 installation of an overhead sign structure at U.S. 70S (SR-1, LM 3.39): The contractor, subcontractors and TDOT personnel met on site August 10, 2015 to verify field elevations for the new overhead sign structure. The contractor will begin work once the shop drawings of the structure have been approved. Work will consist of removing portions of the existing median barrier rail and lengthening the existing structure before the new sign is placed. All motorists should use extreme caution and be alert to construction equipment and vehicles on the project. The contractor may have short-term lane closures to perform various operations on an as-needed basis. Flaggers will assist with traffic control as necessary. Estimated project completion date is November 2015. [LoJac Safety, Inc./Sorrelle/CNP115]

WHITE AND PUTNAM COUNTIES, SR-111 resurfacing from north of SR-136 in White County (LM 17.43) to north of SR-136 in Putnam County (LM 2.03): Work on this project continues. The contractor will conduct milling and paving operations on the shoulders for the SR-136 on- and off-ramps in each direction during this report period. The contractor will have temporary ramp closures to complete paving operations on an as needed basis. Message boards and arrow boards are installed to assist traffic with upcoming lane closures and warning motorists in advance of lane shifts. Motorists should use caution and be alert to construction equipment and vehicles within the work zone. Estimated project completion is September 2015. [Tinsley Asphalt, LLC/Sorrelle/CNP111]

VAN BUREN COUNTY, SR-111 grading, drainage, and paving from south of Manus Road to south of SR-285 near Double Bridge Road: Work on this project continues. Utilities are currently being installed. Grading and blasting operations continue and the contractor is addressing the slope with removal of unsuitable material and installing graded solid rock within the construction zone. Motorists should expect periodic delays. Flaggers will be present during progression of work. Motorists should use caution and be alert to construction equipment and vehicles within the work zone. The speed limit has been reduced to 45 MPH and is being enforced. Estimated project completion date is spring 2016. [Jones Bros., Inc. /Parnham & Price/CNM266]

DEKALB COUNTY, SR-26 (U.S. 70) construction of a welded steel plate girder bridge and three retaining walls over the Caney Fork River and Sligo Road (LM 24.58): Work on this project continues. A new traffic transition has been established leading to the new bridge, and all traffic is now using the new bridge. The contractor will soon begin work on retaining wall 3. On the old bridge, the contractor will soon begin the process to remove the existing bridge deck and structure, and this work will continue over the next few months. All motorists are advised to use extreme caution to the changed conditions and observe all message boards, signs and reduce speed when traveling through the work zone. Be cautious and alert to construction personnel and equipment entering and exiting the work zone. Flaggers will be on site to assist with traffic control. Estimated project completion date is June 2016. [Massman Construction Co./Sorrelle/CNM073]

DEKALB COUNTY, SR-141 slide repair between log mile 0.93 and log mile 1.10, including grading, drainage and paving: Work on this project continues. During construction, the roadway will be closed to traffic for the safety of the traveling public due to the instability of the roadway. The contractor has installing erosion control measures and placing the turbidity curtain. Additional message boards and temporary construction signs have been installed to alert traffic to the road closure. Detours are marked. Estimated project completion date is December 2015. [Jones Brothers, Inc./Sorrelle/CNP006]

PUTNAM COUNTY, SR-56 bridge repair over I-40 at MM 273 (LM 0.54): Work on this project has been completed, and the project is awaiting final inspection. Estimated project completion is August 2015. [Jamison Construction, LLC/Sorrelle/CNN322]

PUTNAM COUNTY, SR-84 slide mitigation at LM 10.5 and LM 11.0, including grading drainage and paving: Work on this project continues. SR-84 is now closed to through traffic in this area because a section of the roadway has become unstable. In the interest of public safety, the roadway will remain closed until it is determined that it is safe to reopen. The contractor continues to work under 24 hour operations to open the roadway at the soonest convenience to the motoring public. Detour routes are marked and all motorists are advised to use approved detours during this time. Estimated project completion is October 2015. [J&M Grading Division, LLC/Sorrelle/CNN169]

PUTNAM COUNTY, Construction of a State Industrial Access Road (Bennett Road) serving Project Victor, including grading, drainage and paving: Work on this project continues. The contractor will be installing signs, working on erosion control measures and mobilizing equipment. All motorists should use caution and be alert to construction equipment and vehicles on the project. Flaggers will assist with traffic control as necessary. Estimated project completion is June 2016. [Vaughn Contractors, Inc./Sorrelle/CNP195]

No comments yet.


The comments are closed.

© Copyright 2020 | Sparta Live

vape: watch vape voopoo drag 2 software update is second hand vape harmful uwell caliburn pods paypal best pod style vape vape bowl monster vape corpus christi tx lowcountry ecig taruto yami vapor vape components vapor trail channel eclipse cigs white chocolate vape juice uwell crown 3 how long do coils last best vw mod ecig dangers alien kit 220w beyond vape skrr coils e cigarette pipe style new vape mods coming out 2017 bulldog e cigarette

face mask: mango face mask best respirator mask for pet urine puclair face mask anti dust gas mask cheap freeman face mask set ulta dust mask costco 3m 7907s full face mask nourishing propolis face mask 3m charcoal face mask elastogel face mask 3m mask for woodworking disposable airsoft anesthesia mask chicken surgical mask hantavirus n95 mask crochet 3m mask keep dust mask box sealed kid mask sand dust bandana box lacrosse face mask mask respirator types near me 3m n95 mask singapore price supreme 3m face mask 3m dust mask 7093

weight loss: 10 pound weight loss juicing weight loss nicotine patch weight loss weight loss pills commercials mauro castano weight loss pills that will make you lose weight ensure drink weight loss weight loss belt at walmart cize weight loss weight loss medications best laxatives for weight loss pro ana best keto diet pills diet pills and birth control vlcd weight loss shift diet pills arava weight loss reveal diet pills review legal diet pills tea diet for weight loss lean mode fat burner vitamins that burn fat best workouts for weight loss

male enhancement: what is libid what is the size of my dick l arginine and pycnogenol ginseng and sex drive most powerful male enhancement product july 2018 age 42 and high sex drive natural male supplements enhancement natural ways to gain testosterone no xl male enhancement sex on last day of pill foods affecting sex drive define male potency low sex drive high maintenance what is term for man who has extreme sex drive viagra for young guys how to get viagra through kaiser permanente how much did viagra cost the military what does a hysterectomy do to sex drive how many pills of viagra can you prescribe where can u buy viagra in the uk counteract low libido from antidepressants transgender and using viagra

cbd oil: cbd oil for tinnitus cbd hyperthyroidism best cbd products 2018 bd marijuana nano craft cbd amazon cbd capsules cbd jackson tn cbd oil merchant services bliss cbd oil cbd with thc for sale how to use cbd vape cartridge kratom vape juice cbd results herbstrong cbd oil rx 2000 vape yolo cbd wax spectrum phone vaping cbd oil benefits zaad cbd oil cbd oil drug interactions hemp cbd oil vs weed cbd oil cbd extract legal

exam: ITexam-Answers 642-565 Material Pdf With The Knowledge And Skills, We Have JK0-011 Real Exam Questions Is The Best Material, Exambible HP0-069 Exam Dump Online Shop, Ucertify HC-722-CHS Dumps Pass4sure Sale, High Success Rate 000-766 Self Study Guaranteed Success, 100% Pass Guarantee ISEB-BA1 Practice Test Online, Prepare for the 70-465 Simulation Questions , Easily To Pass 1Z0-552 Dumps On Sale, Certforall HP2-E32 Preparation Materials Are Based On The Real Exam, Provides ST0-47X Pdf Exam , Experts Revised VCAW510 Ebook Pdf With 100% Pass Rate,