The City of Sparta has been hard at work on our ongoing street pavingproject, and I’m excited to share that we are getting very close to having all of our city streets upgraded with new pavement.
I like to call this our “Under and Over” project. Before any paving takes place, we ensure that everything “under” the street—sewer lines, storm drains, and water connections—is properly inspected and repaired. The last thing we want is to pave a street only to dig it up again. Our city departments are doing a great job making sure all underground work is completed first.
I’m pleased to announce this year’s paving schedule. Please note that some streets listed extend beyond city limits, and paving will only occur within the city boundaries.
Streets to be paved:
Creekside Place
Deer Circle Drive
East Everett Street
Freedom Trail
Golden Mountain Road
Industrial Drive
Jackson Boulevard
Nob Hill Drive
Oak Forest Lane
Oakland Drive
Old Smithville Highway
Roosevelt Drive
South Young Street
Sharon Circle
Sunrise Ridge Drive
Taft Church Road
Thompson Drive
City-owned parking lots to be paved:
City Hall Staff Parking
Civic Center
Electric and Public Works
Fire Station 1
Metcalf Park
Senior Citizens Center
YMCA Front Lot
Public Works
East Maple Parking
Fire Station on Polk
Point Repairs (as needed)
One area of concern is Hampton Drive. We’ve identified issues with the underground infrastructure there, and repairs must be completed before paving can begin.
The paving process will begin soon, so please be cautious when traveling through work zones and patient as we improve your neighborhood.
God Bless, Be Safe, Finish Strong.
Jerry Lowery, mayor
Comments
No comments on this item Please log in to comment by clicking here